Transform raw P6 schedule data into real-time project intelligence. AI-powered forecasting, EOT claims management, and automated stakeholder reporting — built for construction professionals.
Metro Rail — Package 4
Data Date: 15-May-25
Metro Rail Extension — Package 4
Project ID: MRE-P4-2024 | Data Date: 15-May-25 | Laing O'Rourke
Schedule Performance Index
0.88
Behind Schedule
Monitor
Cost Performance Index
0.94
Over Budget
Cost Overrun
Completion %
42%
+2.3% this month
Data Date: May 2025
Total Float
12d
-3 days vs last
Reducing
S-Curve Analysis
Planned Value vs Earned Value vs Actual Cost
Critical Activities
AI Narrative Generator
SPI 0.88 — schedule slippage detected. 12 critical activities require immediate attention. EAC $26.1M exceeds BAC by $1.6M. Forecast completion 18 days late.
Powered by Mistral — Local & Offline
Everything a planning manager
actually needs
Built by project controls professionals who were tired of switching between P6, Excel, and PowerPoint. One platform. Every tool.
Every KPI. One screen. Live.
Connect directly to your P6 database and see SPI, CPI, progress, and critical activities update in real time — no manual exports, no stale data.
- Direct P6 SQLite connection
- S-Curve: Planned vs Actual vs AI Forecast
- Live WebSocket updates
- AI narrative summary in plain English
Know the future before it happens.
Monte Carlo simulation gives you probability-based completion dates. Stop reporting single-point estimates — report with confidence.
- P50/P80/P90 completion date forecasts
- EAC, ETC, VAC — all calculated automatically
- AI anomaly detection catches problems early
- Tornado diagram of top schedule risk drivers
Win every Extension of Time claim.
The most complete EOT management tool in any construction software. From notice tracking to delay analysis methodology — built by planners, for planners.
- Delay analysis methods: TIA, Windows Analysis, CAB, As-Planned vs As-Built
- Concurrent delay calculator — 4 legal approaches
- FIDIC 28-day notice tracker with countdown alerts
- Dispute risk score with 6-factor breakdown
See the critical path. Control the outcome.
Interactive Gantt chart with real P6 data. Colour-coded critical path, float analysis, and network diagram — everything you need for schedule forensics.
- Interactive Gantt with zoom and filter
- Critical path network diagram
- Negative float highlighting and alerts
- Activity detail on click
Never miss a threshold breach again.
Configure RAG thresholds for SPI, CPI, and float. Get instant email and browser push notifications the moment performance drops — not at the end of the month.
- RAG status: Red, Amber, Green across all KPIs
- Email notifications via Gmail SMTP
- Browser push notifications — works when tab is closed
- Automated daily and weekly digest reports
Give clients visibility. Keep control.
A separate read-only portal your clients can access 24/7. They see progress, milestones, and RAG status — nothing else. No more weekly status calls.
- Separate login at /portal/login
- Read-only: KPIs, S-Curve, milestones, RAG
- Professional branded presentation
- Zero access to admin features or claims data
Your P6 data. Instantly. No exports.
Connect directly to your Primavera P6 Professional SQLite database — your full portfolio, available in seconds without touching P6.
- Direct SQLite read — no manual XER exports
- Read-only — never modifies your P6 database
- Full portfolio available in seconds
Every change logged. Every dispute won.
Tamper-proof PostgreSQL audit trail records every change — who, what, when, from what value to what. Your legal protection in every dispute.
- Database-level triggers — cannot be bypassed
- Captures user, IP, timestamp, old and new values
- Exportable as contemporaneous evidence
- Filter by table, user, operation, date range
The claims management tool
construction needed
From the 28-day notice to forensic delay analysis — every tool you need to submit, defend, and win Extension of Time claims.
Claims Register
Late Site Access
28d
ApprovedGround Conditions
42d
Under ReviewConcurrent Delay
21d
DisputedPermit Delay
22d
Submitted113d
Total Claimed
34d
Approved
$730K
Prolongation
Delay Analysis Methods
Time Impact Analysis
Inserts delay fragnet into baseline schedule.
Best for: FIDIC contracts
Contractual Notice Tracker
2 Due SoonSub-Clause 20.1
FIDIC notice period requirement
28 days
Time bar risk
Compensation event notice
NEC notice period requirement
Contract-specific
Delay notice
JCT notice period requirement
Contract-specific
Missing the FIDIC 28-day notice can forfeit your entire EOT claim. P6 Intelligence tracks every deadline automatically.
Dispute Risk Score
68
/ 100
Simple, transparent pricing
No per-seat nonsense. No hidden add-ons. One price covers your whole team.
Starter
Billed annually
For individual planners and small project teams getting started with P6 analytics.
- 1 P6 project connected
- Real-time dashboard
- S-Curve and KPI monitoring
- Smart alerts via email
- PDF report export
- 14-day data history
- Monte Carlo simulation
- EOT claims module
- Client portal
- Audit trail
- Push notifications
- AI narrative engine
Professional
Billed annually
For project controls teams managing active construction projects with full analytics.
- Up to 10 P6 projects
- Real-time dashboard
- S-Curve and KPI monitoring
- Smart alerts email and push
- PDF and Excel export
- 90-day data history
- Monte Carlo simulation
- EOT claims module
- Client portal 3 users
- Audit trail
- Push notifications
- AI narrative engine
Enterprise
For large contractors and PMCs managing multiple projects across programmes.
- Unlimited P6 projects
- Real-time dashboard
- S-Curve and KPI monitoring
- Smart alerts all channels
- All export formats
- Unlimited data history
- Monte Carlo simulation
- EOT claims module
- Unlimited client portals
- Advanced audit trail
- Push notifications
- Custom AI fine-tuning
Need a custom deployment?
On-premise installation, SSO integration, custom branding, dedicated support, and SLA guarantees.
Frequently asked questions
What is P6 Intelligence?
P6 Intelligence is a web-based analytics and Extension of Time (EOT) claims management platform for construction project controls teams, built on top of Primavera P6 schedule data.
Does my Primavera P6 data get sent to the cloud for AI processing?
No. The AI Engine runs Mistral 7B locally via Ollama, on your own machine — it does not call an external API, and no project data leaves your network for AI processing.
How does P6 Intelligence get my P6 data?
Through the P6 Intelligence Agent, a Windows desktop app that runs in your system tray and reads your local Primavera P6 Professional SQLite database directly, syncing to your dashboard automatically roughly once a minute.
Is there a free trial?
Yes, 14 days, no credit card required.
What does the EOT module actually do?
It's a claims register plus delay-analysis tooling covering multiple methodologies — Time Impact Analysis, Windows Analysis, Collapsed As-Built, and As-Planned vs As-Built — plus a concurrent-delay calculator, tied to your live P6 schedule data.
What is the Client Portal?
A separate, read-only view you can share with clients, employers, or financiers to see project status without giving them access to claims data or admin functions.
What is the Audit Trail for?
It logs changes across the platform — who changed what, and when — to support governance reviews and provide a documented record if a dispute arises.
What does pricing look like?
Three tiers — Starter, Professional, and Enterprise — billed monthly or annually with an annual discount. Enterprise is custom-quoted. See the pricing page for current numbers.
What are the system requirements for the desktop Agent?
Windows 10/11, 64-bit, and an existing Primavera P6 Professional installation with a local SQLite database.